Advantages: Looking for information about this vessel. Does anyone have experience with this vessel? How was the atmosphere onboard?
Disadvantages: No personal experience yet, just gathering info.
The 'Finlaggan', serving on the route Kennacraig-Islay, suffered a technical issue, which required a further repair. As a consequence, the scheduled 01:00 p.m. departure from Kennacraig was delayed to...
The 'Finlaggan', serving on the route Kennacraig-Islay, suffered a technical issue affecting the starboard side mooring winch on Jan 28, 2026. Following a review, the vessel was able to operate the sc...
The 'Finlaggan', serving on the route Kennacraig-Islay, suffered a technical issue with the generator on Jan 18, 2026. For contractor attendance, the ferry was repositioned to Kennacraig with the afte...
Due to a technical issue with the fuel pump of the 'Finlaggan’, serving on the route Kennacraig-Port Askaig on Dec 31, the scheduled sailing at 1 p.m. from Kennacraig was delayed until 2:30 p.m. This...
The 'Finlaggan', serving on the route Kennacraig-Islay, suffered a technical issue withthe port side main engine on the morning of Dec 11. As a consequence, the following sailings have been cancelled:...
The 'Finlaggan', serving on the route Kennacraig-Islay, suffered a technical issue withthe mezzanine deck on Nov 24. As a consequence, the service was operating with a delay of approximately 25 minute...
On Nov 16, the 'Finlaggan', serving on the route Port Askaig-Port Ellen, suffered an issue with the Port FRC. As a consequence, the scheduled 10:00 a.m. sailing from Port Ellen was at risk to be delay...
The port side stabiliser of the 'Finlaggan', serving on the route Kennacraig-Islay' suffered a technical issue has been removed from operation on Sep 25. As a consequence, limitations were in place re...
The 'Finlaggan', serving on the route Kennacraig-Islay, suffered a technical issue with a generator on Sep 5. As a consequence, the departures from Kennacraig at 07:00 a.m., 01:00 p.m., 06.00 p.m. and...
The 'Finlaggan', serving on the route Kennacraig-Islay, suffered an issue with the lift on Sep 1. As a consquence,. the scheduled 09:45 a.m. departure from Port Ellen was delayed. A temporary repair t...
The 'Finlaggan', serving on the route Kennacraig-Islay, suffered a technical issue with the mezzanine deck on July 6. As a consequence, the scheduled 6:00 p.m. service departing Port Askaig was delaye...
The 'Finlaggan', serving on the route Kennacraig - Islay, suffered an issue with its fast rescue craft on June 209, 2025. As a consequence,, the scheduled 10:00 a.m. departure from Kennacraig was disr...
The 'Finlaggan', sailing on the route Kennacraig-Islay, suffered an issue with the starboard side main engine on Feb 5, 2025, at midday. As a consequence, the scheduled sailing from Kennacraig at 1 p....
The 'Finlaggan', serving on the route Kennacraig-Islay, suffered an issue with the bow door on the night of Jan 30, 2025. The failure resulted in the vessel operating delayed. The ferry sailed from Ke...