AceMaritimes.com

Caledonian-Isles

IMO Number
9051284
Vessel Type
Passenger Ro Ro Cargo Ship
Flag
United Kingdom

Photos

Vessel Specifications

MMSI
232001580
Callsign
MRAB8
Width
16.0 m
Length
96.0 m

Crew Reviews (1)

★ ★ ★ ☆ ☆
Donald - Oiler

Advantages: Looking for information about this vessel. Curious if anyone's sailed on this vessel? Would you recommend it?

Disadvantages: No personal experience yet, just gathering info.

Latest News

Ferry suffered issue with mooring equipment
May 18, 2026

**Title: Technical Glitch Halts Service for Caledonian Isles Ferry** **Content:** The 'Caledonian Isles', a key player on the Ardrossan - Brodick ferry route, recently encountered a technical challen...

Ferry suffered main engine issue
Apr 15, 2026

**Title: Engine Troubles Disrupt Caledonian Isles Ferry Service** On April 15, the 'Caledonian Isles', a key ferry operating between Ardrossan and Brodick, experienced a significant technical setback...

Ferry removed from service due to technical issue
Mar 25, 2026

**Title: 'Caledonian Isles' Ferry Out of Commission Due to Mechanical Issues** The ferry 'Caledonian Isles', which regularly operates the Ardrossan-Brodick route, has been sidelined due to a series o...

One ferry fixed, one still sidelined
Mar 19, 2026

**Title: One Ferry Back in Action as Another Faces Technical Setbacks** In a positive development for ferry services, the 'Caledonian Isles' successfully completed its sea trials, marking a significa...

Ferry removed from service due to propulsion issues
Mar 06, 2026

**Title: 'Caledonian Isles' Ferry Grounds Operations Due to Technical Glitch** **Content:** The 'Caledonian Isles', which operates on the crucial Ardrossan-Brodick route, encountered a propulsion sys...

Ferry suffered engine problems
Feb 19, 2026

The 'Caledonian Isles' was supposed to be out on sea trials on the afternoon of Feb 15. However, the ferry was experiencing engine problems. It remained stationary at the quay of the Dales Marine in G...

Return from overhaul delayed
Feb 15, 2026

The return of the 'Caledonian Isles', serving on the route Trroon-Brodick, which docked at the Dales Marine in Greenock for its annual overhaul on Jan 10, 2026, which was scheduled to return on Feb 7,...

Ferry suffered fuel pump issue
Dec 19, 2025

The 'Caledonian Isles', serving on the route Ardrossan-Brodick, suffered a technical issue with the fuel pump which required a repair on dec 19. As a consequence, the following sailings had to be canc...

Ferry shifted due to issues with Ardrossan linkspan
Dec 18, 2025

Due to issues with the Ardrossan linkspan combined with adverse weather, the service of the 'Caledonian Isles', operating on the route to Brodick, and operational requirements as a result of storm dam...

Sailings at risk due to stabiliser issue
Dec 08, 2025

The service of the 'Caledonian Isles' between Ardrossan and Brodick were at a heightened risk of disruption and cancellation due to weather conditions in conncection with technical problems aboard the...

Ferry suffered stabiliser issues
Nov 29, 2025

The 'Caledonian Isles', serving on the route Ardrossan - Brodick, suffered an issue with the port side stabiliser on Nov 28. The stabiliser has been removed from operation. During periods of adverse w...

Ferry left repair dock
Nov 14, 2025

The 'Caledonian Isles', serving on the route Ardrossan-Brodick, departed the Inchgreen Dry Dock in Greenock after completion of repairs on the afternoon of Nov 13 and arrived back in Ardrossan at appr...

Divers to inspect possible bow thruster damage
Nov 11, 2025

With efforts to resolve the bow thruster issue of rhe ' Caledonian Isles' ongoing, the current deployment plan for Arran and Islay will remain in place until Nov 14 inclusive. This means that Arran wi...

Ferry suffered bow thruster issue
Nov 05, 2025

The ''Caledonian Isles', serving on the route Ardrossan-Brodick, suffered a technical issue with its bow thruster, that required further investigations, on Oct 29. As a consequence, the departure from...

Ferry taken out of service due to thruster issue
Nov 03, 2025

On Nov 2, divers were sent down in the port of Adrdrossan to attendance the the source of the bow thruster issue of the 'Caledonian Isles', but no solution has been found. As a result of the ongoing i...

More sailings cancelled due to engine issue
Oct 22, 2025

As the investigations into the technical issue of the starboard side engine of the 'Caledonian Isles' were ongoing at the ferry's berth in Ardrossan on Oct 22, more scheduled sailings had to be cancel...

Ferry suffered ramp and stbilizer issues
Oct 21, 2025

Due to a technical issue with the stern ramp of the 'Caledonian Isles', serving on the route Adrossan-Brodick, on Oct 20, the vessel was operating single ended. Vehicles may be required to reverse on...

Ferry sidelined due to engine trouble
Oct 21, 2025

Services have been cancelled between Ardrossan and Brodick as a result of another technical issue with the 'Caledonian Isles' on OCt 21. The problem, within the vessel's starboard main engine, require...

First sailings after lengthy repairs scheduled
Oct 01, 2025

The 'Caledonian Isles', will be serving the route Ardrossan-Brodick again on Oct 1 following successful sea trials and completion of repairs. The ship had left Troon en route to Ardrossan on Sep 30. I...

Ferry could return to servie within days
Sep 26, 2025

The 'Caledonian Isles', after having been out of service since January 2024, returned to North Ayrshire on the morning of Sep 24 and could be back in full service on the Ardrossan to Brodick route wit...

Ferry exited drydock
Sep 17, 2025

On Sep 17, the 'Caledonian Isles' exited drydock in Leith. The vessel will now undertake a programme of checks and familiarisation that will begin with a few days of trials on the Forth. In June, duri...

Investigations ongoing in Edinburgh
Aug 19, 2025

Due to ongoing investigations with the 'Caledonian Isles', operating on the route Ardrossan-Brodick in the Imperial Drydock of the Dales Marine Systems in Edinburgh, there is no scheduled service to A...

Ferry left Greenock to be drydocked in Leith
Jul 25, 2025

The 'Caledonian Isles' has left the James Watt Dock of the Dales Marine in Greenock on the evening July 25, as the ferry operator tries to find a solution to technical problems that have kept the ship...

Ferry has to return to drydock
Jul 22, 2025

CalMac said on July 22 that the 'Caledonian Isles' would return to dry dock for further repairs which would likely take between eight weeks and four months, prompting a re-think of the winter timetabl...

CalMac bid to reclaim costs for repairs
Jul 07, 2025

CalMac is trying to recover millions of pounds of repair costs for the 'Caledonian Isles', which has been sidelined from the Arran route since Jan 2024, The costs has already risen to nearly £11m. The...

Ferry may have to return to dry dock due to pitch control issue
Jul 04, 2025

After the 'Caledonian Isles' ran into problems during sea trials which unearthed issues with the ship's gearbox, engineers have been working around the clock to get to the root of the problem, with th...

Ferry will not be back when Alfred is off
Jul 01, 2025

The 'Caledonian Isles' will not return to service by July 7, the date when the 'Alfred' comes off-service for essential maintenance until July 21. Last week, deployment plans were shared for the whole...

Ferry's return delayed again
Jun 26, 2025

The 'Caledonian Isles' has returned to the drydock in Ardrossan on June 20 for further investigations into the ongoing issue with the pressure levels in the propulsion system.. Following attendance by...

View Full Desktop Version