← Back to list

Scarabeo-5

IMO: 8754970

Service Ship, Bahamas

Photos

Scarabeo-5

Vessel Details

MMSI

311076700

Callsign

C6AD7

Width

73.0 m

Length

111.0 m

Reviews (1)

Gabriel

2024-03-23

Position: Cook

Advantages:

Looking for information about this vessel. Curious if anyone's sailed on this vessel? Would you recommend it?

Disadvantages:

No personal experience yet, just gathering info.

Latest News (3)

Rig partially evacuated after fire

Nov 23, 2016 09:28

On Nov 22, 2016, at 5.30 p.m. a fire broke out on the "Scarabeo 5" in the Njord field in the Norwegian Sea. There were 106 people on board when the fire occurred. 33 people were evacuated from the rig by three helicopters. 14 of these were flown to a nearby installation rig and 19 to Kristiansund. One person was sent ashore for a medical examination. The other 73 crew members remained on board, and operator Statoil had no plans to move more people from the rig. The fire was extinguished three hours later, and the crew was currently working to return to normal operation. The "Scarabeo 5" was not in the process of drilling, when the fire broke out.

Rig to be laid up due to overcapacity

Jul 07, 2014 09:20

Owing to overcapacity in its rig portfolio, Statoil will suspend its contract with Saipem for the "Scarabeo 5" from the autumn of 2014, provisionally for the remainder of the year which means that the rig will be laid up for a brief period. Statoil was planning to re-commission the rig after the turn of the year. The rig is currently engaged in operations on Visund and is scheduled to complete its work there in August 2014. The period for which the rig is being taken out of operation is equivalent to less than 3 % of Statoil’s drilling capacity on the Norwegian continental shelf (NCS) this year. The rig is on contract until 2017 and will be used for the drilling and completion of production wells on various NCS fields, thus boosting recovery from existing fields. Taking Scarabeo5 out of commission for a brief period will not affect Statoil’s production targets or planned exploration activities on the NCS. In 2014 the company will still be drilling 20-25 exploration wells on the NCS. Out of these 20-25, Statoil will be the operator of approximately two-thirds of the wells.

Fire on oil rig in Botlek

Sep 20, 2013 10:42

On Sep 20, 2013, a fire broke out on the oil rig "Scarabeo 5" at the Keppel Verolme Yard in the Botlek, Rotterdam. Three workers were wounded, one employee suffered burns and was taken to hospital. Two others were treated on site for smoke inhalation. The fire which caused a lot of smoke was meanwhile under control. Dutch reports with photos and video: http://www.rijnmond.nl/nieuws/20-09-2013/drie-gewonden-bij-brand-op-booreiland-keppel-verolme http://www.telegraaf.nl/binnenland/21907089/__Gewonden_op_booreiland__.html

Frequently Asked Questions

🔥 Were there any fires on Scarabeo-5?

Based on available news reports, Scarabeo-5 has been mentioned in connection with fire-related incidents. There have been 2 news reports mentioning fire incidents. For detailed information about specific incidents, please refer to the latest news section above.

Fire Incident Reported

🤕 Were there any injuries or accidents on Scarabeo-5?

Based on available news reports, Scarabeo-5 has been mentioned in connection with injury-related incidents. There have been 2 news reports mentioning injury incidents. For detailed information about specific incidents, please refer to the latest news section above.

Injury Incident Reported

🛢️ Did Scarabeo-5 have any oil spills or pollution incidents?

Based on available news reports, Scarabeo-5 has been mentioned in connection with spill-related incidents. There have been 3 news reports mentioning spills. For detailed information about specific incidents, please refer to the latest news section above.

Spill Incident Reported

Leave a Review