Hallaig

IMO: 9652832

Passenger Ro Ro Cargo Ship, United Kingdom

Photos

Hallaig

Vessel Details

MMSI

235099235

Callsign

2GOT8

Width

12.0 m

Length

43.0 m

Reviews (1)

Logan

2025-02-12

Position: Tankerman

Advantages:

Looking for information about this vessel. Any thoughts on this vessel? Was the pay decent?

Disadvantages:

No personal experience yet, just gathering info.

Latest News (3)

Sailings cancelled due to technical issue

Jul 17, 2025 13:53

Due to a technical issue on the 'Hallaig', serving on the route Sconser-Raasay, on July 17, the scheduled 07:55 a.m. sailing departing from Raasay and the 08:25 a.m. sailing departing from Sconser had to be cancelled. The ship was sidelined in Raasay for repairs. While the investigations into the issue were ongoing, also the the 08:55 a.n. sailing departing Raasay and the 09:25 a.m. sailing departing Sconser were cancelled. After troubleshooting, the ferry returned to service with a delayed 08:55 a.m. sailing departing from the port of Raasay. The 'Hallaig' operated a shuttle service. The vessel intended to go back to timetable at 12:15 p.m.

Ferry suffered technical issue

Feb 03, 2025 12:18

Pending attendance of shore-based engineers, weather restrictions have been placed on the 'Hallaig', serving on the route Raasay-Sconser, on Feb 2, 2025.In order to provide additional capacity, the 'Hallaig' operated the following additional sailings: Departure Raasay – 09:00 a.m. Departure Sconser – 09:30 a.m. After engineers have attended the ship, and the technical issue has been resolved, the service resumed with the departure from Raasay at 04:30 p.m. and at 5:00 p.m. from Sconser.

Battery ferry forced to sail with diesel after failure

Jan 13, 2024 14:05

The 'Hallaig', which had suffered a battery failure and was taken out of service in Raasay on Sep 7, 2023, has been forced to run exclusively on diesel fuel for some time and will continue to do so well into the year 2025. Officials expected repairs to the battery to be completed no earlier than April 2025, at a cost of 1,5 million Euros.

Frequently Asked Questions

🛠️ Did Hallaig experience any breakdowns or mechanical failures?

Based on available news reports, Hallaig has been mentioned in connection with breakdown-related incidents. There have been 1 news reports mentioning breakdowns. For detailed information about specific incidents, please refer to the latest news section above.

Breakdown Reported

⚙️ Did Hallaig have any engine problems?

Based on available news reports, Hallaig has been mentioned in connection with engine-related incidents. There have been 3 news reports mentioning engine problems. For detailed information about specific incidents, please refer to the latest news section above.

Engine Problem Reported