← Back to list

Stena-Don

IMO: 8764418

Offshore Vessel, United Kingdom

Photos

Stena-Don

Vessel Details

MMSI

232020225

Callsign

MEOY4

Width

81.0 m

Length

95.0 m

Reviews (1)

Nathan

2024-08-28

Position: Welder

Advantages:

Looking for information about this vessel. Looking for info about this ship? Was the crew alright?

Disadvantages:

No personal experience yet, just gathering info.

Latest News (3)

Damen Verolme Rotterdam Wins Refit Contract For Drilling Rig ‘STENA Don’

Aug 05, 2018 14:00

Damen Verolme Rotterdam (DVR), one of Damen Shipyards Group’s most experienced yards in the repair and refit of complex offshore structures, has been awarded a contract by Stena Drilling for a refit of its drilling rig Stena Don. The vessel will arrive at DVR in October 2018 and is expected to remain there for around three months. The most significant aspect of the works will be the installation of an eight-point mooring system prior to the rig being deployed off the UK’s Shetland Islands.

Stena Drilling rig handed early termination by Statoil

Oct 26, 2016 09:46

Noway’s Statoil has announced a decision to cancel the contract for Stena Drilling semisubmersible rig Stena Don. While the rig had been contracted through to February 2017, Statoil says that the cancellation will take effect once the rig completes plugging activity at its Troll field early November. Statoil says it doesn’t have any further activities where the rig can be utilised. Stena Don has been on contract to Statoil since February 2014, operating at the Troll and Fram fields. http://splash247.com/stena-drilling-rig-handed-early-termination-statoil/

Keppel Verolme to upgrade semisubmersible for repeat customer

Aug 14, 2015 08:42

Keppel Verolme BV (Keppel Verolme), a wholly owned subsidiary of Keppel Offshore & Marine Limited (Keppel O&M) in the Netherlands, has secured a contract from repeat customer Stena Drilling Ltd.The contract is the repair and upgrade of STENA DON, a harsh environment semisubmersible (semi) for Stena Drilling Ltd. Part of the yard’s work scope for this project is a midlife upgradefor the fourteen year old vessel, which includes maintenance and renewal of the drillingequipment and accommodation. The rig will undergo its regular Special Periodic Survey (SPS) as well as maintenance works, thruster overhauls and a painting program The vessel was docked in Keppel Verolme’s large dry-dock no. 7 on 12 August, 2015

Frequently Asked Questions

⚙️ Did Stena-Don have any engine problems?

Based on available news reports, Stena-Don has been mentioned in connection with engine-related incidents. There have been 2 news reports mentioning engine problems. For detailed information about specific incidents, please refer to the latest news section above.

Engine Problem Reported

🛢️ Did Stena-Don have any oil spills or pollution incidents?

Based on available news reports, Stena-Don has been mentioned in connection with spill-related incidents. There have been 1 news reports mentioning spills. For detailed information about specific incidents, please refer to the latest news section above.

Spill Incident Reported

Leave a Review