← Back to list

Seajacks-Zaratan

IMO: 9596571

Offshore Support Vessel, Japan

Photos

Seajacks-Zaratan

Vessel Details

MMSI

431050000

Callsign

7KIJ

Width

41.0 m

Length

81.0 m

Reviews (1)

Jordan

2023-09-28

Position: Crane Operator

Advantages:

Looking for information about this vessel. Can someone share their experience on this vessel? Would you recommend it?

Disadvantages:

No personal experience yet, just gathering info.

Latest News (3)

Meerwind Süd windfarm installation complete

Apr 19, 2014 09:06

WindMW GmbH has recently celebrated installation of the final turbine and offshore converter station at their 288MW Meerwind Süd offshore windfarm in the German North Sea. The 'Seajacks Zaratan' has been active in construction of the Meerwind windfarm

Jackup Rig berthed at Steubenhöft Cuxhaven due to technical trouble

Nov 16, 2012 11:04

Due to technical trouble the "Seajacks Zaratan" which is contracted by the WindMW GmbH Bremerhaven with the transport and installation of monopiles and transition pieces in a wind plant off Helgoland, had to berth at the Steubenhöft in Cuxhaven in the late afternoon of Nov 15, 2012, instead of using its normal berth 9.4. How long the ship would have to remain there could not yet be specified by its agents Sartori & Berger. German report with photos: http://www.cn-online.de/lokales/news.html?tx_ttnews%5Btt_news%5D=33477&tx_ttnewsextender%5BimgIndex%5D=0&cHash=4c773cc114aa609a69db55babb19e9f7

Start of construction work for first wind plant off Heligoland

Aug 29, 2012 10:21

The "Seajacks Zaratan" was the first large ship to use the new berth 9.4 in Cuxhabven on Aug 28, 2012, in the afternoon. Secondly, it marked the start of the construction work of the first wind plant off Heligoland for which Cuxhaven is the base port. The British company Sejacks UK Ltd. was contracted to build a total of 80 plants for the WindMW GmbH in Bremerhaven 23 kilometers north of the island, thereby using Siemens turbines with a capacity of 3.6 MW (total 288 MW). The foundation of the single units os consisting of a single, 60-meter and 600-ton monopile, which will be connected with a transition piece and the the tower, nacelle and the rotor blades. The monopile and the somewhat shorter transition pieces are manufactured in the factory Cuxhavener Ambau GmbH. The "Seajacks Zaratan" will carry three foundation pipes to the wind plant and ramm it into the sea bottom at a water depth of 22 to 26 meters. German report with photos: http://www.cn-online.de/lokales/news/cuxhaven-liefert-die-fundamente.html?tx_ttnewsextender%5BimgIndex%5D=0&cHash=ba4916a6d592bc279694ff8e1cec9411

Frequently Asked Questions

🌊 Did Seajacks-Zaratan sink or have any sinking incidents?

Based on available news reports, Seajacks-Zaratan has been mentioned in connection with sinking-related incidents. There have been 1 news reports mentioning sinking incidents. For detailed information about specific incidents, please refer to the latest news section above.

Sinking Incident Reported

⚙️ Did Seajacks-Zaratan have any engine problems?

Based on available news reports, Seajacks-Zaratan has been mentioned in connection with engine-related incidents. There have been 1 news reports mentioning engine problems. For detailed information about specific incidents, please refer to the latest news section above.

Engine Problem Reported

Leave a Review