← Back to list

Hoegh-Galleon

IMO: 9820013

Fsru Tanker, Singapore

Photos

Hoegh-Galleon

Vessel Details

MMSI

563173800

Callsign

9V8450

Width

43.0 m

Length

298.0 m

Reviews (1)

Noah

2025-05-14

Position: Wiper

Advantages:

Looking for information about this vessel. Trying to find out more about this boat? Any red flags?

Disadvantages:

No personal experience yet, just gathering info.

Latest News (3)

Tanker captain medevaced after collpase

Nov 17, 2020 09:05

The US Coast Guard medevaced a mariner nine miles offshore Corpus Christi, Texas, in the afternoon of Nov 16, 2020. Coast Guard Sector/Air Station Corpus Christi watchstanders received a call from the 'Hoegh Galleon' stating that the captain of the vessel had collapsed and was unresponsive. Watchstanders consulted with the duty flight surgeon who recommended the medevac. A Sector/Air Station Corpus Christi MH-65 Dolphin helicopter crew was launched to the scene. Once on scene, the aircrew hoisted and transported the mariner to awaiting emergency services personnel at the CHRISTUS Spohn Hospital Corpus Christi-Shoreline in stable condition. The tanker berthed in Corpus Christi on Nov 17 at 1 a.m. Report with photo: https://coastguardnews.com/coast-guard-medevacs-mariner-offshore-corpus-christi-texas/2020/11/16/

Höegh LNG announces delivery of FSRU number ten, Höegh Galleon

Aug 28, 2019 09:41

Höegh LNG Holdings Ltd. (Höegh LNG) today took delivery of Höegh Galleon, its tenth floating storage and regasification unit (FSRU), the company said in its release. This high-specification FSRU has been constructed at Samsung Heavy Industries in South Korea and has a storage capacity of 170 000 cbm of LNG and a regasification capacity of 750 million standard cubic feet per day. The vessel is equipped with a GTT Mark III membrane containment system and tri-fuel diesel-electric (TFDE) propulsion. The delivery of the Höegh Galleon marks the completion of Höegh LNG’s current newbuilding programme and confirms the company’s position as the industry leader in the FSRU market.

Höegh LNG enters into interim charter with Cheniere for newbuild LNG carrier

Jul 12, 2019 10:30

Norway’s Höegh LNG has entered into an interim LNG carrier time charter with Cheniere Marketing International for its newbuild Höegh Galleon. The time charter will commence in September, following the delivery of the vessel from Samsung Heavy Industries.

Frequently Asked Questions

⚙️ Did Hoegh-Galleon have any engine problems?

Based on available news reports, Hoegh-Galleon has been mentioned in connection with engine-related incidents. There have been 1 news reports mentioning engine problems. For detailed information about specific incidents, please refer to the latest news section above.

Engine Problem Reported

🚓 Was Hoegh-Galleon detained or arrested?

Based on available news reports, Hoegh-Galleon has been mentioned in connection with detention-related incidents. There have been 1 news reports mentioning detentions. For detailed information about specific incidents, please refer to the latest news section above.

Detention Reported

Leave a Review