← Back to list

Helix-Producer-1

IMO: 8420115

Production Testing Vessel, Bahamas

Photos

Helix-Producer-1

Vessel Details

MMSI

311062000

Callsign

C6RK2

Width

29.0 m

Length

161.0 m

Reviews (1)

William

2025-03-19

Position: Chief Engineer

Advantages:

Looking for information about this vessel. Looking for info about this vessel? Any red flags?

Disadvantages:

No personal experience yet, just gathering info.

Latest News (3)

Medevac off Port Fourchon

Feb 19, 2024 09:27

The US Coast Guard medevaced a 56-year-old man from the 'Helix Producer 1', approximately 95 miles south of Port Fourchon, Louisiana, on Feb 17, 2024. Coast Guard Sector New Orleans watchstanders received a report from the Helix Producer 1 of a crew member experiencing kidney stone symptoms. Watchstanders coordinated the launch of a Coast Guard Air Station New Orleans MH-60 Jayhawk helicopter anda Coast Guard Aviation Training Center Mobile HC-144 Ocean Sentry to assist. The helicopter arrived on scene, landed on the helicopter pad, transferred the man aboard and transported him to awaiting emergency medical services personnel at the University Medical Center, New Orleans. The man was last reported to be in stable condition. Report with video: https://www.news.uscg.mil/Press-Releases/Article/3680287/coast-guard-medevacs-man-near-port-fourchon-la/

Helix’ Floating Production Unit Loses Power in Gulf of Mexico Resulting in Emergency Disconnect

Mar 31, 2014 11:03

The Helix Producer 1 (HP-1), a former Baltic Sea train ferry, now floating production unit in the Gulf of Mexico, was forced to hit the emergency disconnect button and shut-in production while on location at the Phoenix Field in Green Canyon Block 237 yesterday. Talos Energy, the operator of the field notes in a statement that the vessel, owned by Helix Energy Solutions Group, “experienced a power outage at 1:45 p.m. CST on Friday while testing the ship power management system.” Prior to the emergency disconnect, the vessel was producing at a rate of 13,500 barrels of oil per day while dynamically positioned in 2000 feet of water. Less than a gallon of hydrocarbons were released into the environment, the company notes. Talos adds that although electrical power has since been restored, production has not yet resumed while an investigation into the incident is launched by the Bureau of Safety and Environmental Enforcement, Helix ESG and Talos Energy.

HELIX PRODUCER 1 8420115

Jul 08, 2010 10:15

Bad weather with wave heights of 2,5 metres kept the "Helix Producer 1" from being connected to the riser in the Gulf of Mexico until July 7.

Frequently Asked Questions

🌊 Did Helix-Producer-1 sink or have any sinking incidents?

Based on available news reports, Helix-Producer-1 has been mentioned in connection with sinking-related incidents. There have been 1 news reports mentioning sinking incidents. For detailed information about specific incidents, please refer to the latest news section above.

Sinking Incident Reported

🤕 Were there any injuries or accidents on Helix-Producer-1?

Based on available news reports, Helix-Producer-1 has been mentioned in connection with injury-related incidents. There have been 1 news reports mentioning injury incidents. For detailed information about specific incidents, please refer to the latest news section above.

Injury Incident Reported

💥 Was Helix-Producer-1 involved in any collisions?

Based on available news reports, Helix-Producer-1 has been mentioned in connection with collision-related incidents. There have been 1 news reports mentioning collisions. For detailed information about specific incidents, please refer to the latest news section above.

Collision Reported

🛢️ Did Helix-Producer-1 have any oil spills or pollution incidents?

Based on available news reports, Helix-Producer-1 has been mentioned in connection with spill-related incidents. There have been 1 news reports mentioning spills. For detailed information about specific incidents, please refer to the latest news section above.

Spill Incident Reported

Leave a Review