← Back to list

Hea-Kraken

IMO: 9522207

Offshore Support Vessel, Panama

Photos

Hea-Kraken

Vessel Details

MMSI

370267000

Callsign

3ESD6

Width

36.0 m

Length

63.0 m

Reviews (1)

Justin

2025-01-31

Position: Third Officer

Advantages:

Looking for information about this vessel. Thinking of joining this vessel? Would sail again?

Disadvantages:

No personal experience yet, just gathering info.

Latest News (2)

Refurbished Seajack vessel leaves Shipdock Amsterdam ready to work

Aug 01, 2014 08:56

‘Seajacks Leviathan’ and ‘Seajacks Kraken’ are prepared for their coming assignments, following a series of repair and renewal jobs by Shipdock Amsterdam. The shipyard, part of Damen Shiprepair & Conversion, had been commissioned for the two jack-ups by Seajacks UK Ltd. The Great Yarmouth (United Kingdom) based company has assigned the shipyard various and different major and minor adjustments on the two jack-up sister vessels in between North Sea offshore windfarm and oil & gas installation contracts. Shipdock Amsterdam’s major work on ‘Seajacks Kraken’ involved the replacement of the vessel’s two entire lifeboat davit sets. This included installing Niron Staal prefabricated foundations and the four new davits with their powerpack, cable, winch, electricity and hydraulic systems. This was finished off by surveyor-assessed test runs and loads test. Furthermore, the Kraken’s four legs were restored after an initial joint inspection round with the principal’s inspectors. Repairs involved S690 grade steel. In addition to crane tests and crane hook certification update surveys, the Seajacks jack-up vessel underwent miscellaneous minor steel work and had two new satellite dome platforms installed.

World's largest offshore wind turbine installed at Ormonde Offshore Wind Farm

Aug 05, 2011 07:34

Vattenfall has now completed the installation of the final turbine at its pioneering wind farm off the coast of north-west England. The 30th turbine at Ormonde Offshore Wind Farm was installed Monday with the final rotor lift from A2Sea s vessel, the SeaJack. Installation was completed four months after the first turbine was erected. Vattenfall now looks forward to generating electricity from the wind farm for the first time later this summer. Ormonde s 30 REpower 5M wind turbines have a total installed capacity of 150MW. It is capable of generating enough electricity annually to meet the equivalent electricity needs of 100,000 UK households. More at http://www.power-eng.com/news/2011/08/1472081438/united-kingdom-world-s-largest-offshore-wind-turbine-installed-at-ormonde-offshore-wind-farm.html

Frequently Asked Questions

⚙️ Did Hea-Kraken have any engine problems?

Based on available news reports, Hea-Kraken has been mentioned in connection with engine-related incidents. There have been 1 news reports mentioning engine problems. For detailed information about specific incidents, please refer to the latest news section above.

Engine Problem Reported

🛢️ Did Hea-Kraken have any oil spills or pollution incidents?

Based on available news reports, Hea-Kraken has been mentioned in connection with spill-related incidents. There have been 1 news reports mentioning spills. For detailed information about specific incidents, please refer to the latest news section above.

Spill Incident Reported

🚓 Was Hea-Kraken detained or arrested?

Based on available news reports, Hea-Kraken has been mentioned in connection with detention-related incidents. There have been 1 news reports mentioning detentions. For detailed information about specific incidents, please refer to the latest news section above.

Detention Reported

Leave a Review