← Back to list

Ivar-Aasen

IMO: 9156943

Passenger Ro Ro Cargo Ship, Norway

Photos

Ivar-Aasen

Vessel Details

MMSI

257429900

Callsign

LIRB

Width

15.0 m

Length

87.0 m

Reviews (1)

Billy

2024-09-06

Position: Able Seaman

Advantages:

Looking for information about this vessel. Curious if anyone's sailed on this vessel? What was it like?

Disadvantages:

No personal experience yet, just gathering info.

Latest News (4)

Ferry sidelined with technical fault

Sep 01, 2025 12:23

The 'Ivar Aasen', serving between Mordalsvågen and Solholmen (Molde), had to cancel its sailings on Aug 30 at 5.45 p.m. due to a technical fault until further notice by the operator Fjord 1. The ship was sidelined at the quay on Solholmen. Later on the evening, Fjord 1 the reserve ferry “Eira” was inserted with the first departure at 8:35 p.m. from Mordalsvågen. There were large queues on both sides of the connection. it was unclear how long the "Ivar Aasen" would be out of service. It remained stationary in Molde as of Sep 1.

Ferry suffered technical issue

Mar 21, 2025 10:42

The ''Ivar Aasen' serving on the route Solholmen-Mordalsvågen in Molde, had to cancel its service on March 20 at 7.45 p.m. The reason is a technical fault, the Norwegian Public Roads Administration reported. A little later it was announced that the route would be resumed. There was an extra trip from Mordalsvågen at 8:10 p.m. and from Solhomen at 8:30 p.m.

Troubled ferry blocking quay

Mar 21, 2025 10:40

The 'Ivar Aasen', serving on the route between Solholmen and Mordalsvågen, ran aground on a reef on the late evening of March 5. 2026. The ship was breached, and 1,5 tons oil leaked out. The operator Fjord 1 announced that the connectionwas was suspended with the "Ivar Aasen" blocking the quay at Solholmen. The company was waiting for permits before the ship could be moved, to be able to deploy a reserve vessel. The route was served again on March 6 at 3.35 p.m. The 'Ivar Aasen' left Tomrefjord after repairs on March 19 and returned onto the route.

Technical trouble sidelined ferry

Aug 05, 2015 12:20

The "Iver Aasen" suffered technical problems on Aug 3, 2015, so that the ferry service from Sølsnes to Åfarnes was suspended for repairs in Sølsnes. Long queues of vehicles built up at the Sølsnes-side until repairs were completed. Norwegian report with photo: http://www.rbnett.no/nyheter/article11379001.ece

Frequently Asked Questions

⚙️ Did Ivar-Aasen have any engine problems?

Based on available news reports, Ivar-Aasen has been mentioned in connection with engine-related incidents. There have been 4 news reports mentioning engine problems. For detailed information about specific incidents, please refer to the latest news section above.

Engine Problem Reported

🛢️ Did Ivar-Aasen have any oil spills or pollution incidents?

Based on available news reports, Ivar-Aasen has been mentioned in connection with spill-related incidents. There have been 1 news reports mentioning spills. For detailed information about specific incidents, please refer to the latest news section above.

Spill Incident Reported

Leave a Review