Express-1
IMO: 9501590
Passenger Ro Ro Cargo Ship, Denmark
Photos
Vessel Details
MMSI
219017081
Callsign
OUYM2
Width
30.0 m
Length
112.0 m
Reviews (1)
Christopher
2024-08-22
Position: Second Officer
Advantages:
Looking for information about this vessel. Looking for info about this ship? Would you recommend it?
Disadvantages:
No personal experience yet, just gathering info.
Latest News (3)
Ferry cannot use shore current system
A fault in the shore current system on the 'Express 1' made it impossible to use the system on the ferry, shortly after the shore power system at the Øernes Quay in Rønne. The system had to be disconnected again, and a change in the ship's technology, where the power from shore is received, is needed. The error is expected to be corrected within the next few days.
Ferry suffered techncal trouble
The 'Express 1' suffered technical trouble on March 14, 2020, and the departure from Rønne to Ystad at 10:30 a.m. had to be cancelled. The Bornholm Linjen inserted the repalcement ferry 'Povl Anker' with a departure from Rønne at. 11:15 a.m. and from Ystad at 2.30 p.m. For this reason there was a delay on the route. The shipping company initially hoped that the 'Express 1' would be ready to start operating again with a departure from Rønne at 2:30 p.m. In fact the ship left the port at 6.30 p.m. The Bornholm Line states that the express ferry Express 1 is ready to sail again. Due to technical problems, the ferry was canceled all day and replaced by M / F Povl Anker at Rønne-Ystad. The fast ferry is repaired and leaves from Rønne at 18:30 and returns from Ystad again at 20:30.
Ferry engine broke down
The "Express 1" suffered a broken engine on July 27, affecting all departures to and from Bornholm for both the "MAX" and the "Express 1" on that day and on July 29 as the ship slowed down after it lacked an engine. During the repairs, the Bornholm Line has sailed to completely new timetables. Departures were delayed between twenty minutes and up to 3,5 hours. But the Bornholm line has chosen not to deploy the "Povl Anker" or to change ferries passengers should sail with, despite the hour-long delays as not to cause too much confusion. They expected the engine to be operating again on July 30.
Frequently Asked Questions
🛠️ Did Express-1 experience any breakdowns or mechanical failures?
Based on available news reports, Express-1 has been mentioned in connection with breakdown-related incidents. There have been 1 news reports mentioning breakdowns. For detailed information about specific incidents, please refer to the latest news section above.
⚙️ Did Express-1 have any engine problems?
Based on available news reports, Express-1 has been mentioned in connection with engine-related incidents. There have been 2 news reports mentioning engine problems. For detailed information about specific incidents, please refer to the latest news section above.