Finlaggan
IMO: 9482902
Passenger Ro Ro Cargo Ship, United Kingdom
Photos
Vessel Details
MMSI
235083892
Callsign
2ECF2
Width
16.0 m
Length
89.0 m
Reviews (1)
William
2024-04-07
Position: Welder
Advantages:
Looking for information about this vessel. Does anyone have experience with this vessel? How was the atmosphere onboard?
Disadvantages:
No personal experience yet, just gathering info.
Latest News (14)
Ferry suffered technical issue
The 'Finlaggan', serving on the route Kennacraig-Islay, suffered a technical issue, which required a further repair. As a consequence, the scheduled 01:00 p.m. departure from Kennacraig was delayed to 02:15 p.m. This had a knock on effect throughout the day.
Ferry suffered issue with mooring winch
The 'Finlaggan', serving on the route Kennacraig-Islay, suffered a technical issue affecting the starboard side mooring winch on Jan 28, 2026. Following a review, the vessel was able to operate the scheduled 6:00 p.m. sailing from Kennacraig, which had been at risk of cancellation or disruption initially.
Ferry suffered generator issue
The 'Finlaggan', serving on the route Kennacraig-Islay, suffered a technical issue with the generator on Jan 18, 2026. For contractor attendance, the ferry was repositioned to Kennacraig with the afternoon sailing being cancelled. To allow further investigations to be carried out, the scheduled 07:00 a.m. sailing from Kennacraig and 09:45 a.m. sailing from Port Ellen on Jan 19 had to be cancelled too. After the technical issue has been resolvedm the vessel resumed its service with the 1:00 p.m. sailing from Kennacraig.
Ferry suffered fuel pump issue
Due to a technical issue with the fuel pump of the 'Finlaggan’, serving on the route Kennacraig-Port Askaig on Dec 31, the scheduled sailing at 1 p.m. from Kennacraig was delayed until 2:30 p.m. This had a knock on affect to the 3:30 p.m. sailing from Port Askaig. After repairs were carried out. the vessel started to load traffic in order to depart Kennacraig as soon as possible.
Ferry suffered engine issue
The 'Finlaggan', serving on the route Kennacraig-Islay, suffered a technical issue withthe port side main engine on the morning of Dec 11. As a consequence, the following sailings have been cancelled: Departure Kennacraoig - 1:00 p.m. Departure Port Askaig - 3:30 p.m. An update was to be provided by the operator CalMac at approximately 3:00 p.m. for the 6:00 p.m. departure from the port of Kennacraig.
Ferry suffered technical issue with mezzanine deck
The 'Finlaggan', serving on the route Kennacraig-Islay, suffered a technical issue withthe mezzanine deck on Nov 24. As a consequence, the service was operating with a delay of approximately 25 minutes.
Ferry suffered issue with Port FRC
On Nov 16, the 'Finlaggan', serving on the route Port Askaig-Port Ellen, suffered an issue with the Port FRC. As a consequence, the scheduled 10:00 a.m. sailing from Port Ellen was at risk to be delayed.
Ferry suffered stabiliser issue
The port side stabiliser of the 'Finlaggan', serving on the route Kennacraig-Islay' suffered a technical issue has been removed from operation on Sep 25. As a consequence, limitations were in place regarding the weather and sea states, in which the vessel was still able to safely operate. The operator CalMac was investigations the options for a repair and developed repair plans. During periods of adverse weather, the service remained at a heightened risk of disruption or cancellation at short notice.
Ferry suffered generator issues
The 'Finlaggan', serving on the route Kennacraig-Islay, suffered a technical issue with a generator on Sep 5. As a consequence, the departures from Kennacraig at 07:00 a.m., 01:00 p.m., 06.00 p.m. and from Port Ellen at 09.45 a.m. and from Port Askaig at 03:30 p.m. were liable to disruption or cancellation as well as the departure from Kennacraig on Sep 6 at 06:00 p.m. and from Port Askaig at 08:15 p.m. After the repairs were completed and the ship tested successfully, the 'Finlaggan' resumed its service on Sep 7 with the 07:00 a.m. sailing from Kennacraig.
Ferry operated delayed due to lift issue
The 'Finlaggan', serving on the route Kennacraig-Islay, suffered an issue with the lift on Sep 1. As a consquence,. the scheduled 09:45 a.m. departure from Port Ellen was delayed. A temporary repair to the lift was carried, out and the crew continued to investigate the issue on the passage to Kennacraig. The ferry departed Port Ellen at 11:00 a.m. with an ETA at Kennacraig as of 1:30 p.m.
Ferry suffered issue with mezzanine deck
The 'Finlaggan', serving on the route Kennacraig-Islay, suffered a technical issue with the mezzanine deck on July 6. As a consequence, the scheduled 6:00 p.m. service departing Port Askaig was delayed. After the issue was successfully resolved, the ferry finally departed from the port at 6:50 p.m., 50 minutes late, with an ETA in Kennacraig as of 8:45 p.m.
Ferry suffered issue with fast rescue craft
The 'Finlaggan', serving on the route Kennacraig - Islay, suffered an issue with its fast rescue craft on June 209, 2025. As a consequence,, the scheduled 10:00 a.m. departure from Kennacraig was disrupted. The ferry finally departed from Kennecraig at 10:45 a.m., causing a knock on effect to the remainder of the day’s sailings. Customers were advised to check in as normal.
Ferry delayed due to engine and mezzanine deck issues
The 'Finlaggan', sailing on the route Kennacraig-Islay, suffered an issue with the starboard side main engine on Feb 5, 2025, at midday. As a consequence, the scheduled sailing from Kennacraig at 1 p.m. and the departure from Port Askaig at 3.30 p.m. were delayed to allow repairs to take place. These sailings weree liable to cancellation at short notice. After the issue with the main engine has been resolved, the vessel started loading operations.. The 3:30 p.m. sailing from Port Askaig finally started at 6:45 p.m. Due to an issue with the mezzanine deck, the vessel's arrival in Kennacraig on Feb 6 be delayed. Passengers booked on the scheduled 1:00 p.m. departure from the port of Kennacraig were, however, requested to check in as normal.
Ferry delayed and re-routed due to bow door issue
The 'Finlaggan', serving on the route Kennacraig-Islay, suffered an issue with the bow door on the night of Jan 30, 2025. The failure resulted in the vessel operating delayed. The ferry sailed from Kennacraig at 7:20 p.m., one hour and 20 minutes late, and arrived in Port Askaig at 9:15 p.m. The scheduled sailing on Jan 31 at 07:00 a.m. from Kennacraig now departed at 08:00 a.m. and diverted to Port Askaig. The scheduled crossing from Port Ellen at 09:45 a.m. now departed from Port Askaig instead.
Frequently Asked Questions
🛠️ Did Finlaggan experience any breakdowns or mechanical failures?
Based on available news reports, Finlaggan has been mentioned in connection with breakdown-related incidents. There have been 1 news reports mentioning breakdowns. For detailed information about specific incidents, please refer to the latest news section above.
⚙️ Did Finlaggan have any engine problems?
Based on available news reports, Finlaggan has been mentioned in connection with engine-related incidents. There have been 11 news reports mentioning engine problems. For detailed information about specific incidents, please refer to the latest news section above.
🧑🚒 Was Finlaggan involved in any migrant rescue operations?
Based on available news reports, Finlaggan has been mentioned in connection with migrant-related incidents. There have been 1 news reports mentioning migrant operations. For detailed information about specific incidents, please refer to the latest news section above.